      IMPLEMENTATION OF THE MINESIGHT® TOOLS IN THE LAS CUEVAS MINE OF VALE COAL COMPANY IN COLOMBIA Translated title: APLICACIÓN DE LAS HERRAMIENTAS DE MINESIGHT® EN LA MINA DE CARBÓN LAS CUEVAS DE VALE COLOMBIA

      research-article

      Read this article at

      Bookmark
          There is no author summary for this article yet. Authors can add summaries to their articles on ScienceOpen to make them more accessible to a non-specialist audience.

          Abstract

          This paper presents the implementation of the MineSight® tools in a theoretical project based on the Las Cuevas mine. The project relies on conventional modeling, project configuration, deployment, drilling handling and the creation of the geological and block models that make it possible to reliably determine the exploitable mineral resources of interest. An overview of the project is presented along with a theoretical case study beginning with the generation of polygons in sections representing the seams, using the true thickness tool. After this, economic envelopes were presented using the MSOPIT and MSVALP tools, together with some coal mining requirements. Finally, operational pits were designed using the Pit Expansion tool in order to optimally exploit the site and facilitate economic balance throughout the project. Upon finishing this, the Interactive Planner (IP) tool was used to carry out short-term planning.

          Translated abstract

          Este trabajo expone la implementación de herramientas MineSight® en un proyecto hipotético que será tomado como base en la mina Las Cuevas, apoyado en la modelación convencional, configuración del proyecto, desiegues, manipulación de sondajes, la creación del modelo geológico y de bloques, que permita determinar con confianza los recursos explotables del mineral de interés. Se presentan las generalidades del proyecto seguido de un caso de estudio hipotético, que inicia con la generación de polígonos en secciones para mantos con la utilización del true thickness, seguidamente se presentan las envolventes económicas en MSOPIT y MSVAL con algunos requerimientos para la minería de carbón. Posteriormente se realizan pits operacionales utilizando la herramienta Pit Expansion tool con la cual se busca explotar el yacimiento de manera óptima y facilitar el equilibrio económico a lo largo del proyecto, en su culminación se realiza el planeamiento a corto plazo con la herramienta Interactive Planner (IP).

          Related collections

          Most cited references5

          • Record: found
          • Abstract: found
          • Article: found
          Is Open Access

          A METHODOLOGICAL MODEL TO ASSIST IN THE OPTIMIZATION AND RISK MANAGEMENT OF MINING INVESTMENT DECISIONS

          Identifying, quantifying, and minimizing technical risks associated with investment decisions is a key challenge for mineral industry decision makers and investors. However, risk analysis in most bankable mine feasibility studies are based on the stochastic modelling of project “Net Present Value” (NPV)which, in most cases, fails to provide decision makers with a truly comprehensive analysis of risks associated with technical and management uncertainty and, as a result, are of little use for risk management and project optimization. This paper presents a value-chain risk management approach where project risk is evaluated for each step of the project lifecycle, from exploration to mine closure, and risk management is performed as a part of a stepwise value-added optimization process.
            Bookmark
            • Record: found
            • Abstract: not found
            • Book: not found

            Open pit mine planning & design

              Bookmark
              • Record: found
              • Abstract: not found
              • Book: not found

              Manual de evaluación técnico económica de proyectos mineros de inversión

                Bookmark

                Author and article information

                Journal
                dyna
                DYNA
                Dyna rev.fac.nac.minas
                Universidad Nacional de Colombia (Medellín, Antioquia, Colombia )
                0012-7353
                2346-2183
                December 2012
                : 79
                : 176
                : 124-129
                Affiliations
                [03] orgnameNational University of Colombia at Medellín orgdiv1School of Mines orgdiv2Department of Materials Engineering
                [02] orgnameNational University of Colombia at Medellín orgdiv1School of Mines orgdiv2Department of Materials Engineering
                [01] orgnameNational University of Colombia at Medellín orgdiv1School of Mines orgdiv2Department of Materials Engineering
                [04] orgnameNational University of Colombia at Medellín orgdiv1School of Mines orgdiv2Department of Materials Engineering
                Article
                S0012-73532012000600015 S0012-7353(12)07917615
                068cc9d2-3619-4183-8845-0fec88aa0f1f

                This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.

                History
                : 03 August 2012
                : 30 April 2012
                Page count
                Figures: 0, Tables: 0, Equations: 0, References: 10, Pages: 6
                Product

                SciELO Colombia

                Self URI: Full text available only in PDF format (EN)
                Categories
                Articles

                modelamiento geológico,Colombia,Vale,mine design,Open pit,geological modeling,coal,mine planning,MineSight®,diseño minero,carbón,planeamiento minero

                Comments

                Comment on this article

                Similar content66

                Most referenced authors15