The Thetis research pool reactor (with a nominal power of 150 kW) of the Ghent University was operational from 1967 till December 2003. The first phase of the decommissioning of the reactor, the removal of the spent fuel from the site, took place in 2010. The cumulative dose received was only 404 man · μSv. During the second phase, the transition period between the removal of the spent fuel in 2010 and the start of the decommissioning phase in March 2013, 3-monthly internal inspections and inspections by Bel V, were performed. The third and final decommissioning phase started on March 18, 2013. The total dose received between March 2013 and August 2013 was 1561 man · μSv. The declassification from a Class I installation to a Class II installation was possible by the end of 2015. The activated concrete in the reactor pool will remain under regulatory control until the activation levels are lower than the limits for free release.
Der Thetis Poolreaktor der Universität in Ghent wurd von 1967 bis zum Dezember 2003 mit einer Nennleistung von 150 kW betrieben. In der ersten Phase der Stilllegung wurde in 2010 der abgebrannte Brennstoff entfernt. Dabei betrug die kumulierte Dosis 404 man · μSv. Bis zum März 2013 dauerte die Übergangsphase, in der dreimonatlich interne und offizielle (durch Bel V) Inspektionen durchgeführt wurden. Am 18. März 2013 startete die endgültige Stilllegung. Dabei wurden die Arbeiter zwischen März und August 2013 mit insgesamt 1561 man · μSv belastet. Zu Ende des Jahres 2015 wurde die Anlage von einer Class I in eine Class II Anlage umdeklariert. Der aktivierte Beton im Reaktorpool bleibt unter behördlicher Aufsicht solange, bis der Aktivierungsgrad die Grenzwerte für eine Freimessung unterschreiten.