      Planta de Tratamiento en Interior Mina de las Aguas Ácidas de la Mina San José - Oruro - Bolivia: PRIMER PREMIO - II FERIA NACIONAL DE INVESTIGACIÓN, CIENCIA Y TECNOLOGÍA DEL SISTEMA UNIVERSITARIO BOLIVIANO

      research-article

      Read this article at

      Bookmark
          There is no author summary for this article yet. Authors can add summaries to their articles on ScienceOpen to make them more accessible to a non-specialist audience.

          Abstract

          Resumen La mina San José está ubicada en la ciudad de Oruro. El drenaje ácido generado en el interior de la mina, con valores de pH fuertemente ácidos de 1.2 a 2.5, es bombeada a 8 litros por segundo; y sin ningún tratamiento, es vertida al medio ambiente. Dichas aguas ácidas, desembocan finalmente en el lago Urú-Urú. La carga de metales disueltos anual que es de: 1 Kg de Cd; 11 Kg de Cu; 761 Kg de Fe; 14 Kg de Pb; 13 Kg de As; 0,3 Kg de Sb y 22 Kg de Zn. El objetivo del presente trabajo de investigación se circunscribió a estudiar técnica, económica, ambiental y socialmente, las alternativas de tratamiento de las aguas ácidas de la Mina San José a partir de pruebas a escala de laboratorio y planta piloto. Las alternativas de tratamiento estudiadas fueron: Evaporación - Cristalización; Neutralización - Precipitación con cal en superficie; Drenes de Caliza Anoxicos; y finalmente, Neutralización - Precipitación con cal en interior mina. De los resultados de la valoración técnica, económica, ambiental y social, se concluyó que la última alternativa es la más adecuada. El estanque de tratamiento y separación sólido/líquido en el interior mina, consiste en una galeria abandonada de 104 m de largo, 2 m de ancho y una altura de 1.8 m. Ésta permitirá el tratamiento de 691.2 m3/día de agua ácida. El consumo de cal como lechada requerido es de 6.9 toneladas por día. Las aguas de rebose del estanque de tratamiento serán bombeadas al exterior a un pH de descarga de 6.7; por tanto, dichas descargas cumplirán con la acidez de descarga y en gran medida, la de los límites permisibles de descarga de metales pesados. Finalmente, la descarga de los lodos generados será de manera discontinua mediante una bomba lamera; y estos, serán dispuestos en los rajos abandonados que se encuentran a 150 m del punto de descarga de estanque de tratamiento. El costo de inversión del proyecto es 282.686,01 $us y los costos de operación ascenderan a 383.918,32 $us por año.

          Translated abstract

          Abstract The San José mine is located in the city of Oruro. Acid drainage generated inside the mine, with strongly acidic pH values of 1.2 to 2.5, is pumped to 8 liters per second; without any treatment, it is poured into the environment. Such acidic waters eventually flow into Lake Uru-Uru. The annual burden dissolved metals are: 1 kg of Cd; 11 Kg of Cu; 761 Kg of Fe; 14 kg of Pb; 13 Kg of As; 0.3 Kg of Sb and Zn 22 Kg. The objective of this research was limited to study technical, economic, environmental and socially, alternative treatment of acidic waters of the Mina San Jose from laboratory scale tests and pilot plant. Treatment options studied were: Evaporation - Crystallization; Neutralization - precipitation with lime surface; Anoxic limestone drains; and finally, Neutralization - precipitation with lime inside the mine. From the results of the technical, economic, environmental and social assessment it concluded that the last option is the most appropriate. The treatment pond and solid / liquid separation inside mine, an abandoned gallery is 104 m long, 2 m wide and a height of 1.8 m. This will allow treatment of 691.2 m3 / day acidic water. Lime consumption as required grout is 6.9 tons per day. Overflow water treatment pond will be pumped to the outside at pH 6.7 download; therefore they comply with such discharges discharge acidity and largely the permissible limits of heavy metal discharge. Finally, the discharge of sludge generated is discontinuously by Lamera pump; and these will be arranged in the abandoned are 150 m from the discharge point of treatment pond pits. The investment cost of the project is US \(282,686.01 and operational costs amount to \) 383,918.32 US peryear

          Related collections

          Most cited references14

          • Record: found
          • Abstract: not found
          • Article: not found

          Use of evaporation ponds for brine disposal in desalination plants

            Bookmark
            • Record: found
            • Abstract: not found
            • Book: not found

            Perry's Chemical Engineers' Handbook

              Bookmark
              • Record: found
              • Abstract: not found
              • Book: not found

              "PMAIM Suproyecto 6 - Informe Final No. 3. Definición del Plan de Remediación Global

              (2000)
                Bookmark

                Author and article information

                Journal
                mamym
                Revista de Medio Ambiente y Mineria
                REV. MAMYM
                EDITORIAL UNIVERSITARIA de la Universidad Técnica de Oruro. (Oruro, , Bolivia )
                2519-5352
                October 2016
                : 1
                : 5-11
                Article
                S2519-53522016000100001 S2519-5352(16)00000100001
                e6ae53a4-fd09-48d9-b2ad-5be78aeb4265

                This work is licensed under a Creative Commons Attribution 4.0 International License.

                History
                Page count
                Figures: 0, Tables: 0, Equations: 0, References: 14, Pages: 7
                Product

                SciELO Bolivia

                Self URI: Texto completo solamente en formato PDF (ES)
                Categories
                ARTÍCULOS ORIGINALES

                Comments

                Comment on this article