The Baku-Tbilisi-Ceyhan (BTC) and South Caucasus Pipelines (SCP) were constructed through Azerbaijan, Georgia and Turkey during the period 2003-5. BTC was built first from the Caspian Coast to the Georgian border during 2003 and 2004, while the SCP pipeline was built from the Georgian border towards the Caspian and parallel to the BTC in 2005. To investigate and mitigate the effects of this construction, a four year archaeological fieldwork programme (2001-2005) was carried out, followed by a further six-year post-excavation programme that ended in early 2011. This article draws on this extensive archaeological project that combines both the broad corpus of material known in Azerbaijan and new techniques introduced in the Republic for the first time and used on a range of sites that are of both national and international significance.