      Control measure prioritization in Fine − Kinney-based risk assessment: a Bayesian BWM-Fuzzy VIKOR combined approach in an oil station

      research-article

      Read this article at

      ScienceOpenPublisherPMC
      Bookmark
          There is no author summary for this article yet. Authors can add summaries to their articles on ScienceOpen to make them more accessible to a non-specialist audience.

          Abstract

          The Fine  − Kinney is a risk assessment method widely used in many industries due to its ease of use and quantitative risk evaluation. As in other methods, it is a method that recommends taking a series of control measures for operational safety. However, it is not always possible to implement control measures based on the determined priorities of the risks. It is considered that determining the priorities of these measures depends on many criteria such as applicability, functionality, performance, and integrity. Therefore, this study has studied the prioritization of control measures in Fine − Kinney-based risk assessment. The criteria affecting the prioritization of control measures are hierarchically structured, and the importance weights of the criteria are determined by the Bayesian Best–Worst Method (BBWM). The priorities of control measures were determined with the fuzzy VlseKriterijumska Optimizacija I Kompromisno Resenje (FVIKOR) method. The proposed model has been applied to the risk assessment process in a petrol station’s liquid fuel tank area. According to the results obtained with BBWM, the most important criterion affecting the prioritization of control measures is the applicability criterion. It has an importance weight of about 42%. It is followed by performance with 31%, functionality with 18%, and integrity with 10%, respectively. FVIKOR results show that the “Periodic control of the ventilation device” measure is the top priority for Fine − Kinney risk assessment. “The absence of any ducts or sewer pits that may cause gas accumulation in the tank area and near the dispenser; Yellow line marking of entry and exit and vehicle roads; Placing of speed limit warning signs” has been determined as a secondary priority. On conclusion, this proposed model is expected to bring a new perspective to the work of occupational health and safety analysts, since the priority suggested by Fine − Kinney risk analysis methods is not always in the same order as the one in the stage of taking action, and the source, budget, and cost/benefit ratio of the measure affect this situation in practice.

          Supplementary Information

          The online version contains supplementary material available at 10.1007/s11356-022-19454-x.

          Related collections

          Most cited references62

          • Record: found
          • Abstract: not found
          • Article: not found

          Best-worst multi-criteria decision-making method

            Bookmark
            • Record: found
            • Abstract: not found
            • Article: not found

            Extensions of the TOPSIS for group decision-making under fuzzy environment

              Bookmark
              • Record: found
              • Abstract: not found
              • Article: not found

              Best-worst multi-criteria decision-making method: Some properties and a linear model

                Bookmark

                Author and article information

                Contributors
                muhammetgul@munzur.edu.tr
                melihyucesan@munzur.edu.tr
                fatih.ak@antalya.edu.tr
                Journal
                Environ Sci Pollut Res Int
                Environ Sci Pollut Res Int
                Environmental Science and Pollution Research International
                Springer Berlin Heidelberg (Berlin/Heidelberg )
                0944-1344
                1614-7499
                6 April 2022
                : 1-18
                Affiliations
                [1 ]GRID grid.449675.d, ISNI 0000 0004 0399 619X, Department of Emergency Aid and Disaster Management, , Munzur University, ; 62000 Tunceli, Turkey
                [2 ]GRID grid.512465.1, Department of Industrial Engineering, , Antalya Bilim University, ; 07190 Antalya, Turkey
                Author notes

                Responsible Editor: Marcus Schulz

                Author information
                http://orcid.org/0000-0002-5319-4289
                Article
                19454
                10.1007/s11356-022-19454-x
                8984078
                35384537
                861d7f96-811d-440c-b62c-4453a8924243
                © The Author(s), under exclusive licence to Springer-Verlag GmbH Germany, part of Springer Nature 2022

                This article is made available via the PMC Open Access Subset for unrestricted research re-use and secondary analysis in any form or by any means with acknowledgement of the original source. These permissions are granted for the duration of the World Health Organization (WHO) declaration of COVID-19 as a global pandemic.

                History
                : 17 November 2021
                : 23 February 2022
                Categories
                Research Article

                General environmental science
                fine − kinney,control measure prioritization,bayesian best–worst method,vikor,fuzzy set theory,liquid fuel tank

                Comments

                Comment on this article